Ground beams, slabs and concrete foundations can be subject to cracking as a result of the forces of ground movement when built on areas of shrinkable soil. These areas include clay, expansive shale soils, reclaimed land or ground recovery caused by deep excavations.
The structural damage caused by clay is acknowledged by engineers and
designers all over the world. In the U.K the problem is particularly acute in the South East, although climate change is having its effect on soils in other parts of the country.
The solution is to create a void below concrete foundations, allowing unhindered expansion of clay
Heave Stopper - Forming a True Void
Unlike other solutions, Heave Stopper creates a complete void beneath the foundation to offer maximum protection from ground movement.
Heave Stopper is a board material constructed from a cardboard honeycomb core set between water resistant facings. When dry, the boards have a compressive strength that can support concrete and steel up to 1 metre thick without deflection or creep compression. Once the concrete is cured and self supporting, Heave Stopper’s job is done. Water is now introduced to the core, weakening the honeycomb centre and through this allowing Heave Stopper to yield under ground heave without transmitting pressure to the structure. Eventually the board will naturally disappear to leave a permanent 100% void with no residual material to pass on heave stresses. This can allow engineers to maximise efficiencies designing thinner slabs and beams using less concrete and reinforcement steel. Heave Stopper can also be used to create a void to protect structures from vibration.
Using Heave Stopper protects your buildings against the forces of ground movement.
Heave Stopper FAQ
What is anti heave protection? Heave Stopper is used to protect against clay and ground heave, typically on the inside of piled ground beams or deep trench fill foundations. Ground beams, slabs and concrete foundations can be subject to cracking as a result of the forces of ground movement when built on areas of shrinkable soil. These areas include clay, expansive shale soils, reclaimed land or ground recovery caused by deep excavations. The structural damage caused by clay is acknowledged by engineers and designers all over the world. In the U.K the problem is particularly acute in the South East, although climate change is having its effect on soils in other parts of the country. The solution is to create a void below concrete foundations, allowing unhindered expansion of clay
What are heave boards? The Heave Stopper board is an eco-friendly, recycled construction void former that protects against ground movement whilst laying concrete foundations. The closed cell structure means that Heave Stopper can be trimmed tightly around the pile heads and service ducts without losing the integrity of the panel. It is used to create a void underneath the foundation forultimate stability in ground liable to ground heave. Heave Stopper has a high strength to weight ratio. When the honeycomb core is introduced to water it is designed to lose it’s strength in order to permit ground heave without transmitting pressure to the foundations or structures above. Heave Stopper can be installed either side up. It can be easily cut with hand tools and the joints do not need to be taped together with no requirement to tape the joints. Heave Stopper is light and easy to use, Heave Stopper can be installed at a rate of 50m2 per hour or more, by one person.
How do you stop ground heaves? Where heave is likely to be a problem, Heave Stopper should be installed beneath foundations and floor slabs to reduce the upward force of heave from transmitting to the structure above. Heave Stopper is suitable for beams & slabs. Also a perfect solution for contaminated land and brownfield sites.
Can Heave Stopper be used when wet? No. Heaver Stopper cannot be used when wet. The boards must be kept dry, stored off the ground and on the delivery pallets to prevent any moisture ingress whilst in storage. Heave Stopper is also available packaged in a Water Tight 500g Polythene bag to protect the board against natural elements. Please note that the boards will need to be removed from the Polythene bags prior to the concrete being poured.